Bon Appetit!

{alt_text}
March 29, 2024 -  

Ventilation work, LED lighting in the dining room, and kitchen renovations aimed at improving daily DDH life were completed in late March. Students are enjoying better air circulation, brighter lighting, a safer kitchen, and a more environmentally responsible space. New induction ranges and stovehood have been set in new cabinets, with new lighting and floor finish. Most of the work, though, is hidden from sight, with a massive air handler and new ductwork that ensure adequate airflow in the dining room and a rapid response hot water heating system. The design team used environmentally friendly ways to reduce heat in the spaces without introducing air conditioning and while addressing safety concerns associated with gas stoves and ovens. Sparkling pots and pans, suited to induction cooking, were generously gifted by Board President Pam Jones.

Some of the ventilation work got underway last summer. Kitchen renovations began on December 11 with old equipment and surrounding cabinets being torn out and the floor resurfaced and new equipment being set in place over winter break. The nearly $300,000 engineering and renovation project took three years to design, procure proper equipment, and complete.